img Leseprobe Leseprobe

Scheduling in Plant Construction

Ibrahim Kar, Michael Berz

PDF
89,80
Amazon iTunes Thalia.de Hugendubel Bücher.de ebook.de kobo Osiander Google Books Barnes&Noble bol.com Legimi yourbook.shop Kulturkaufhaus ebooks-center.de
* Affiliatelinks/Werbelinks
Hinweis: Affiliatelinks/Werbelinks
Links auf reinlesen.de sind sogenannte Affiliate-Links. Wenn du auf so einen Affiliate-Link klickst und über diesen Link einkaufst, bekommt reinlesen.de von dem betreffenden Online-Shop oder Anbieter eine Provision. Für dich verändert sich der Preis nicht.

Vogel Communications Group GmbH & Co. KG img Link Publisher

Naturwissenschaften, Medizin, Informatik, Technik / Chemische Technik

Beschreibung

Process plants are complex systems for the production of chemical and petrochemical products and require careful planning in order to be completed on time and within budget. Precise and comprehensive scheduling is therefore essential. This book provides a detailed overview of the structure of schedules and the procedure for creating the necessary accompanying documents. The basics of scheduling Planning (engineering) equipment and material purchasing and procurement (Procurement) and Assembly and installation (construction) and Commissioning (testing and pre-commissioning)

Weitere Titel in dieser Kategorie
Cover Biomacromolecules
Mohamed Elzagheid
Cover Plastic Additives
Rudolf Pfaendner

Kundenbewertungen

Schlagwörter

Executing partner, Scope of services, Activity, Trade, Revex engineering, Craft, Detailengineering, Ready for start-up, Summary bar, Discipline, Appraise phase, Define phase, Duration, EPCm, Process detail planning or engineering, Process engineering, Outside battery limits, Project structure plan, Gate review, RACI Matrix, Process, Buffer, Ressources plan, Procurement, Maintenance, Schedule workflow planning, Milestone, EPC, Inside battery limits, Plant construction detail engineering, Scope of work, Work breakdown structure, Select phase, Duration planning, Final investment decision, Schedule / schedule planning, Network planning technique, Operate phase, Top-down-approach, Basis of Design, Feasibility report, Bottom-up-approach, Engineering, Executing engineering or planning, Project, Basic Design Engineering Package, Pre-FID Engineering, Material take-Off (MTO), Risikomanagement, Working time values, Turnaround, Contractor, Constraint, Preliminary planning or engineering, Planning, Rough process planning, Working step, Stakeholder, Contingency, SMART method, Execute phase, Stand-by team